What is Checkpoint?
A dated review in a development plan that decides the next quarter: continue, change or stop. It reads numbers, not feelings, and stopping is a valid result.
Learn it in 60 secondsFrom your pathLesson 4.8.5 · Your Development PlanThink of it like
A health check-up booked months ahead. The results decide what you do next, not how you feel that day.
Real example
Eva's plan has 4 checkpoints, one every 12 ÷ 4 = 3 months. At month 6, two readiness lines say no, so she stays on demo and fixes them.
Key takeaway
- A 12-month development plan holds three skills, weekly practice hours, one measure each and four dated checkpoints.
- Progress comes from a loop you design: plan, trade small, review, change one thing.
- Each checkpoint reads your whole Pro file, and stopping is a valid result.
Lesson 4.8.5 · Your Development Plan